Shell conditions:
• Electrical power distribution;
208/120 volt and 480/277 volt power panels (fused to current building
code) connected to building power.
• Ceiling grid installed to 2x2 with balance
of grid stacked and ceiling tiles in place.
• Installed HVAC distribution system with
primary ductwork throughout the premises. Exterior zone vav boxes
with secondary ductwork and diffusers are installed; interior zone
vav boxes are provided with secondary ductwork and diffusers installed.
• Separate electrical and telephone rooms
on each floor.
• Potable water connections available
at tenant wetstacks.
• All "core" functions including,
but not limited to, restrooms (with showers in Fitness Center),
drinking fountains, HVAC mechanical rooms, telephone rooms, electrical
rooms, ground floor elevator lobby, exit signs, fire
stairwells and all fire and life safety equipment, etc.
• Mini-blinds installed on all exterior
windows.
• Sprinkler lines installed on each floor.
• All floors smooth trowel finished.
|